[1]
Saldanha, M.F.B. et al. 2021. Analysis of production schedules and sequencing through simulations in Preactor as Express 2016® software to reduce delivery delays in a metallurgical company. Brazilian Journal of Production Engineering. 7, 1 (Mar. 2021), 58–71. DOI:https://doi.org/10.47456/bjpe.v7i1.33161.