[1]
Martins, T.L.A. and Azevedo, M.M. de 2025. Resources for the evaluation of the effectiveness of a Kaizen program aimed at reducing Lead Time. Brazilian Journal of Production Engineering. 11, 2 (Jun. 2025), 277–291. DOI:https://doi.org/10.47456/bjpe.v11i2.48071.