[1]
Silva, M.Y.I. et al. 2025. Redesign of the production layout based on Chronoanalysis and Lean Manufacturing: case study in a metal-mechanical industry. Brazilian Journal of Production Engineering. 11, 3 (Sep. 2025), 342–354. DOI:https://doi.org/10.47456/bjpe.v11i3.48753.