(1)
Saldanha, M. F. B.; de Paula, G. C. T. G.; Lopes, P. H. S. Analysis of Production Schedules and Sequencing through Simulations in Preactor As Express 2016® Software to Reduce Delivery Delays in a Metallurgical Company. Braz. J. Prod. Eng. 2021, 7 (1), 58-71. https://doi.org/10.47456/bjpe.v7i1.33161.