1.
Saldanha MFB, de Paula GCTG, Lopes PHS. Analysis of production schedules and sequencing through simulations in Preactor as Express 2016® software to reduce delivery delays in a metallurgical company. Braz. J. Prod. Eng. 2021;7(1):58-71. doi:10.47456/bjpe.v7i1.33161