Saldanha, M. F. B., de Paula, G. C. T. G., & Lopes, P. H. S. (2021). Analysis of production schedules and sequencing through simulations in Preactor as Express 2016® software to reduce delivery delays in a metallurgical company. Brazilian Journal of Production Engineering, 7(1), 58-71. https://doi.org/10.47456/bjpe.v7i1.33161