Saldanha, M.F.B., de Paula, G.C.T.G. and Lopes, P.H.S. (2021) “Analysis of production schedules and sequencing through simulations in Preactor as Express 2016® software to reduce delivery delays in a metallurgical company”, Brazilian Journal of Production Engineering, 7(1), pp. 58–71. doi:10.47456/bjpe.v7i1.33161.