Gonçalves, C.M., Araujo, A.C.B. de and Martins, L.O.S. (2024) “Investigation of the impact of setup time on productivity: a case study in a packaging company”, Brazilian Journal of Production Engineering, 10(3), pp. 112–119. doi:10.47456/bjpe.v10i3.44746.