[1]
M. F. B. Saldanha, G. C. T. G. de Paula, and P. H. S. Lopes, “Analysis of production schedules and sequencing through simulations in Preactor as Express 2016® software to reduce delivery delays in a metallurgical company”, Braz. J. Prod. Eng., vol. 7, no. 1, pp. 58–71, Mar. 2021, doi: 10.47456/bjpe.v7i1.33161.