[1]
N. M. e Silva, W. B. R. Oliveira, M. N. C. Santos, A. de M. Santos, and D. D. Damm, “Application of quality tools in a tire factory: a case study for reducing rework due to tread shortage”, Braz. J. Prod. Eng., vol. 11, no. 2, pp. 244–253, Jun. 2025, doi: 10.47456/bjpe.v11i2.47943.