Abstract

Companies use Lean Manufacturing (LM) practices; however, they have difficulties in measuring maturity to improve them and target goals. Given this context, the objective was to evaluate the maturity of the LM practices of a wire and cable company. To this end, the Maturity Assessment model was used, which measures 17 principles, divided into Structural Elements (SE): philosophy (3); processes (6); people and partners (5); problem solving and continuous improvement (3). In total, 6 managers and 21 employees from the operations and support areas responded to the questionnaires. The principles: create value for the customer; identify the value chain; use visual management; and see for yourself to understand the situation, converged at the same level of maturity between the groups. Furthermore, the operation's employees had the lowest maturity level. Analyzing the SE, there was a positive emphasis on philosophy with grade 4 (integrated), while the others were classified as grade 3 (systematic), with the organization's overall score at 3.80. Finally, the methodology used provided a set of objective goals for improving processes, identifying their strengths and weaknesses, allowing plans to be drawn up leading to organizational development.

Author Biographies
  1. Manoel Isaac Teixeira Nunes Lopes, Federal University of Piauí

    Graduado em Engenharia de Produção pela Universidade Federal do Piauí, atua como Analista de Planejamento e Controle Jr na companhia Águas de Teresina.

  2. Francisca Jociele Oliveira de Sousa, Federal University of Piauí

    Graduada em Engenharia de Produção pela Universidade Federal do Piauí atua como Analista de Qualidade na companhia Ambev

  3. Francismilton Teles, Federal University of Piauí

    -

  4. Hélio Cavalcanti Albuquerque Neto, Federal University of Piauí

    Possui graduação em Engenharia de Produção pela Universidade Federal de Campina Grande (2010) e doutorado em Segurança e Saúde Ocupacionais da Universidade do Porto (2017), atuando como Professor do curso de Engenharia de Produção da Universidade Federal do Piauí. Atualmente é pesquisador do Núcleo de Pesquisa em Eficiência Produtiva e Inovação (NUPEPI) e Grupo de Estudo e Pesquisa de Produtos Agroindustriais do Cerrado (GEPPAC). Desenvolve pesquisas na grande área de Engenharia no Trabalho e nos seguintes temas: ambiente térmico, ergonomia, gestão de processos e controle da qualidade.

  5. Matheus das Neves Almeida, Federal University of Piauí

    Atualmente professor efetivo da Universidade Federal do Piauí - UFPI do curso de Engenharia de Produção. Doutor em Engenharia de Produção pela Universidade Tecnológica Federal do Paraná - UTFPR, mestre em Engenharia de Produção pela Universidade Federal da Paraíba - UFPB e graduação em Engenharia de Produção Mecânica pela Universidade Federal da Paraíba - UFPB. Participou de um intercambio acadêmico BRAFITEC pelo Institut National des Sciences Appliquées (INSA de Lyon - France). Engenheiro responsável de produção na empresa Construtora Norberto Odebrecht do Equador.

  6. Geordy Souza Pereira, Federal University of Piauí

    Doutor em Engenharia Mecânica pela Universidade Estadual de Campinas - UNICAMP (2020). Mestre em Engenharia de Produção pela Universidade Federal de São Carlos - UFSCar (1999) e possui MBA-Executivo em Gestão Tecnológica e Inovação pela Fundação Getúlio Vargas - FGV/RJ (2002). Graduado em Administração pela Universidade Estadual do Maranhão - UEMA (1996). É professor Associado I no curso de Engenharia de Produção na Universidade Federal do Piauí - UFPI. Atualmente é Professor Colaborador no Programa de Pós-Graduação em Propriedade Intelectual e Transferência de Tecnologia para a Inovação - PROFNIT e Coordenador Acadêmico do Curso de Especialização em Logística e Distribuição e do Núcleo de Pesquisa e Extensão em Gestão, Inovação e Empreendedorismo - GERA. Foi Bolsista de Extensão no Programa ALI (Agentes Locais de Inovação) do SEBRAE/CNPq, como orientador acadêmico do ciclo 2020-2022 no estado do Piauí. Tem experiência na área de Administração, com ênfase em Estudos Organizacionais, Gestão da Produção e Arranjos Produtivos Locais. Atuando principalmente nos seguintes temas: Administração, Gestão da Produção, Organização, Sistemas e Trabalho, APL's, Inovação Tecnológica e Empreendedorismo.

References

Alves, A. C., Sigahi, T. F. A. C., Soares, J. M. M., & Saltorato, P. (2018). Da aceitação à rejeição: percepções dos níveis operacional e tático pós-adoção do lean manufacturing. Revista Gestão Industrial, 13(3). https://periodicos.utfpr.edu.br/revistagi/article/view/5732/5492

Bento, G. dos S. & Tontini, G. (2018). Developing an instrument to measure lean manufacturing maturity and its relationship with operational performance. Total Quality Management & Business Excellence, 29(9-10), 977-995. https://doi.org/10.1080/14783363.2018.1486537

Edgeman, R. (2019). Complex management systems and the Shingo model: Foundations of operational excellence and supporting tools. CRC Press.

Galhardi, A. C. & Tabeta, A. M. (2021). Modelos de maturidade em lean manufacturing: uma análise bibliográfica. Brazilian Journal of Business, 3(1), 312–323.

https://doi.org/10.34140/bjbv3n1-019

Iammarino, S., McCann, P., & Ortega-Argilés, R. (2018). International business, cities and competitiveness: recent trends and future challenges. Competitiveness Review, 28(3), 236–251. https://doi.org/10.1108/CR-10-2017-0070

Jones, T. D. & Womack, J. P. (2003). Lean thinking (1ª ed.). Free Press.

Liker, J. K. & Meier, D. (2006). Toyota Way Fieldbook. McGraw-Hill Education.

Liker, J. & Ross, K. (2019). O Modelo Toyota de Excelência em Serviços: A Transformação Lean em Organizações de Serviço. Bookman.

Maasouman, M. A. & Demirli, K. (2015). Development of a lean maturity model for operational level planning. International Journal of Advanced Manufacturing Technology, 83(5-8), 1171-1188. https://doi.org/10.1007/s00170-015-7513-4

Mann, D. (2017). Creating a Lean Culture (3o ed). Productivity Press. https://doi.org/10.1201/b17563

Medeiros, N., Freitas, T., Mota, R., Filho, M., & Júnior, L. (2019, novembro 7). O diagnóstico inicial na implantação do lean manufacturing: um estudo de caso em uma indústria de eletrônicos. XXVI SIMPEP.

Moraes, A. O. de (2020). Desenvolvimento de um modelo de avaliação da maturidade lean nas organizações [Dissertação (Mestrado em Engenharia Industrial), Universidade do Minho].

https://hdl.handle.net/1822/74041

Molinero, G. E. & Gonçales Filho, M. (2022). Implementação de uma cultura Lean Manufacturing no setor de equipamentos de geração de energia: uma análise comparativa entre a teoria e a prática. Brazilian Journal of Production Engineering, 8(1), 18-32. https://periodicos.ufes.br/bjpe/article/view/36826

Oliveira, W. B. R., Guimarães, C. P., Gonçalves, M. C. S., de Araujo, A. C. B., & Pimentel, C. A. (2024). Melhorias no centro obstétrico de um hospital público: estudo de caso do uso de ferramentas do Lean Healthcare. Brazilian Journal of Production Engineering, 10(2), 182-195. https://doi/10.47456/bjpe.v10i2.44242

Pakdil, F. & Leonard, K. M. (2014). Criteria for a lean organisation: Development of a lean assessment tool. International Journal of Production Research, 52(15), 4587-4607. https://doi.org/10.1080/00207543.2013.879614

Rodrigues, L. da S., & Cecconello, I. (2021). Avaliação da Maturidade Lean em uma Célula de Manufatura. Scientia cum Industria, 9(1), 44-55. https://doi.org/10.18226/23185279.v9iss1p44

Santhiapillai, F. P. & Ratnayake, R. M. C. (2018). Identifying and Defining Knowledge-work Waste in Product Development: A Case Study on Lean Maturity Assessment. 2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 834-838. https://doi.org/10.1109/IEEM.2018.8607682

Santos, L. C., Gohr, C. F., Gonçalves, J. M. S., Vilar, F. M. do M., & Arnaud, L. de M. (2017). Identificação e avaliação de práticas de produção enxuta em empresas calçadistas do estado da Paraíba. Revista Produção Online, 17(1), 176-199. https://doi.org/10.14488/1676-1901.v17i1.2403

Santos, P. V. S., Ferraz, A. de V., & Castro Silva, A. C. G. (2019). Utilização da ferramenta mapeamento de fluxo de valor (MFV) para identificação de desperdícios no processo produtivo de uma empresa fabricante de gesso. Revista Produção Online, 19(4), 1197-1230. https://doi.org/10.14488/1676-1901.v19i4.3310

Urban, W. (2015). The Lean Management Maturity Self-assessment Tool Based on Organizational Culture Diagnosis. Procedia - Social and Behavioral Sciences, 213, 728-733. https://doi.org/10.1016/j.sbspro.2015.11.527

Womack, J. P., Jones, D. T., & Roos, D. (2007). The machine that changed the world: The story of lean production--Toyota's secret weapon in the global car wars that is now revolutionizing world industry. Simon and Schuster.

Cover Image
Published
2024-06-21
Section
OPERATIONS & PRODUCTION PROCESS
License

Copyright (c) 2024 Brazilian Journal of Production Engineering

Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

All works published in the Brazilian Journal of Production Engineering (BJPE) are licensed under Creative Commons Attribution 4.0 International (CC BY 4.0). This means that: Anyone can copy, distribute, display, adapt, remix, and even commercially use the content published in the journal; Provided that due credit is given to the authors and to BJPE as the original source; No additional permission is required for reuse, as long as the license terms are respected. This policy complies with the principles of open access, promoting the broad dissemination of scientific knowledge. 🔗 Click here to access the full license

How to Cite

Lopes, M. I. T. N., Sousa, F. J. O. de, Teles, F., Albuquerque Neto, H. C., Almeida, M. das N., & Pereira, G. S. (2024). Diagnosis of the degree of maturity in lean manufacturing: case study in a wire and cable industry. Brazilian Journal of Production Engineering, 10(2), 433-451. https://doi.org/10.47456/bjpe.v10i2.44583