Analysis of production schedules and sequencing through simulations in Preactor as Express 2016® software to reduce delivery delays in a metallurgical company

Authors

DOI:

https://doi.org/10.47456/bjpe.v7i1.33161

Keywords:

Programming, Sequencing, Preactor, PPCP

Abstract

Considering that companies live in a more aggressive and dynamic competitive scenario; production management becomes increasingly necessary. Therefore, the programming and sequencing of production appear as differentials with respect to factors of extreme importance in a production line. In this context, the focus of this work was to use the software Preactor AS Express 2016® to simulate the current sequencing method of the company and, also, other methods offered by the software, in order to find the one that was more agile and efficient. The methodology used was the case study focusing on a specific customer of the company, which represents 74,02% of the annual turnover. The data was obtained through the collection and documentary analysis of the data of the production orders of this client in the months of September and December 2019, these being the biggest participation of the client in the year. The data were imported into the software and different alternatives were analyzed, after these analyzes it was possible to identify that the sequencing alternative used by the company was feasible in months whose production times were higher, the proposed method was efficient even in more emerging months. Finally, it was concluded that the sequencing method used by the company is not the most appropriate, given that emerging months are more common throughout the year, so it is recommended for the company to use the Backwards by order of delivery method.

Downloads

Download data is not yet available.

Author Biographies

Marcos Felipe Bonifácio Saldanha, Faculdades Integradas de Cataguases - Grupo UNIS

He has secondary-secondary education at the Manoel Inácio Peixoto State School (2004). He is currently a Quality Inspector at Metalúrgica Cataguases Indústria e Comércio de Máquinas Ltda. He has experience in the field of Production Engineering.

Gabriel Carrara, Faculdades Integradas de Cataguases - Grupo Unis

Graduating in Production Engineering.

Paulo Henrique, Faculdades Integradas de Cataguases - Grupo Unis

Specialist professor in industrial maintenance engineering

References

Aguiar, E.S, Schramm, F. & Lamônica, C.S (2018). Análise das práticas de Planejamento e Controle da Produção de uma empresa de vidros temperados. Encontro Nacional de Engenharia de Produção. Disponível em: < http://www.abepro.org.br/biblioteca/TN_STO_258_480_35077.pdf>. – Acesso em: 04 de Abril de 2020.

Baldam, R.L, Pitanga, T.R., Costa, L. & Junior, T.P.C (2019). Método para sincronização de produção por batelada em equipamentos de grande porte. Encontro Nacional de Engenharia de Produção – Disponível em: <http://www.abepro.org.br/biblioteca/TN_STP_290_1634_39301.pdf>. – Acesso em: 12 de Abril de 2020.

Eleodoro, L.S., Chaves, L.E. de C., Bortholin, R. de C., Cotian, L.F.P., & Cintra, S.F. (2013). Cálculo do Lote Econômico de Compra de Matérias-Primas Utilizadas no Processo de Tratamento de Água Considerando os Estoques de Segurança e o Lead Time dos Fornecedores. Encontro Nacional de Engenharia de Produção. Disponível em:< http://www.abepro.org.br/biblioteca/enegep2013_TN_STP_177_008_23232.pdf>. – Acesso em : 18 de Maio de 2020.

Felix, J. A. M. (2019). Estudo e Melhoria do Sequenciamento da Produção numa Fábrica de Produção de Revestimentos em Cortiça. Mestrado Integrado em Engenharia e Gestão Industrial – 2019. Disponível em: < https://repositorio-aberto.up.pt/bitstream/10216/121947/2/347047.pdf> - Acesso em: 02 de Novembro de 2020.

Fernandes, R. O. P. (2006). Estudo de Sequenciamento da Produção em uma Indústria de Meias. Monografia - Universidade Federal de Juiz de Fora, Coordenação de Curso de Engenharia de Produção – 2006. Disponível em: <https://www.ufjf.br/engenhariadeproducao/files/2014/09/2005_3_Rafael.pdf> - Acesso em: 14 de Setembro de 2020.

Fuchigami, H. Y.; Rangel, S. (2014). Uma análise de estudos de casos em sequenciamento da produção. In: XLVI Simpósio Brasileiro de Pesquisa Operacional, 2014, Salvador/BA. XLVI SBPO, 2014. Disponível em: <https://www.researchgate.net/profile/Helio_Fuchigami2/publication/278678572_Uma_analise_de_estudos_de_casos_em_sequenciamento_da_producao/links/5583244808aefa35fe30b677/Uma-analise-de-estudos-de-casos-em-sequenciamento-da-producao.pdf> - Acesso em: 14 de Setembro de 2020.

Gassen, G., Graciolli, O.D., Chiwiacowsky, L.D. & Mesquita, A. (2019). Proposta de um modelo de programação linear para otimização do planejamento agregado de produção de brocas para empresa multinacional. Revista Científica Eletrônica de Engenharia de Produção. Disponível em: <https://www.producaoonline.org.br/rpo/article/view/3013/1750>. – Acesso em 18 de Abril de 2020.

Moreira, J.M.M.A.P., Simioni, F.J., & Santana, L.F. de. (2017). Impacto do Custo de Transporte no Risco da Rentabilidade Florestal na Região de Itapeva-SP. Revista Paranaense de Desenvolvimento, 38 (132), 77-89. Disponível em:< http://www.ipardes.pr.gov.br/ojs/index.php/revistaparanaense/article/view/905> – Acesso em: 22 de Março de 2020.

Nunes, D.M., Melo, P.A.C. & Nigro, I.S.C (2009). Planejamento, Programação e Controle da Produção: O uso da simulação do Preactor em uma indústria de alimentos. Encontro Nacional de Engenharia de Produção. Disponível em:< http://www.abepro.org.br/biblioteca/enegep2009_tn_sto_091_616_12552.pdf> - Acesso em: 20 de Abril de 2020.

Oliveira, R. P. D. Sistemas, organização e métodos. São Paulo: Atlas, 2013.

Pinedo, M.L. (2016). Scheduling: theory, algorithms and systems. New York, United States: Springer.

Ribeiro, S.N., Silva, E.V. da S., Sousa, G.C de., Sousa, S.C. de., & Santos, T.S dos. (2018). Aplicação da ferramenta pert/cpm para análise do tempo de produção de sucos em um restaurante no município de Marabá-PA. Brazilian Journal of Production Engineering. Disponível em: <http://periodicos.ufes.br/BJPE/article/view/v4n2_6/pdf> - Acesso em: 15 de Março de 2020.

Santos, P.V.S. (2018). Aplicação do indicador Overall Equipment Effectiveness (OEE): um estudo de caso numa retífica e oficina mecânica. Brazilian Journal of Production Engineering. Disponível em: <http://periodicos.ufes.br/BJPE/article/view/v4n3_1/pdf> – Acesso em 01 de Abril de 2020.

Siemens. (2016). Preactor: Advanced Planning & Schedulin. Disponível em: <https://w3.siemens.com/mcms/mes/de/mes_komponenten/preactor/Pages/Default.aspx> - Acesso em: 25 de Março de 2020.

Tecmaram. (2019). Soluções avançadas para o PCP de sua empresa. Disponível em: <http://www.tecmaran.com.br/solucoes/> - Acesso em: 20 de março de 2020.

Telo, L. R. A., Silva, R.M. da, Silva, A.M. da., Zampini, E. de F., & Paula, W.F. de. (2017). Proposição de sequenciamento da produção com uso do tempo de preparação. South American Development Society Journal, 3 (08), 19-49. Disponível em:< http://dx.doi.org/10.24325/issn.2446-5763.v3i8p29-49> - Acesso em: 20 de Março de 2020.

Tonetto, J. A. R., Azara, W. F., Marçola, J. A., & Júnior, W. A. (2017). Aplicação do Planejamento Avançado da Produção (APS) nas atividades de engenharia do produto. Simpósio de Engenharia de Produção. Disponível em:< http://gestareconsultoria.com.br/consultoria/wp-content/uploads/2018/02/xxiv_simpep_art_1260.pdf>. – Acesso em: 25 de Março de 2020.

TOTVS® (2020). Gestão Industrial. Disponível em: <https://www.totvs.com/blog/gestao-industrial/ppcp/> - Acesso em: 02 de Novembro de 2020.

Viana, J. J. (2009). Administração de materiais: um enfoque prático. São Paulo: Atlas.

Published

2021-03-08

How to Cite

Saldanha, M. F. B., de Paula, G. C. T. G., & Lopes, P. H. S. (2021). Analysis of production schedules and sequencing through simulations in Preactor as Express 2016® software to reduce delivery delays in a metallurgical company. Brazilian Journal of Production Engineering, 7(1), 58–71. https://doi.org/10.47456/bjpe.v7i1.33161

Issue

Section

OPERATIONS & PRODUCTION PROCESS