Abstract

Integrity risks are present throughout the life cycle of an asset, including when in a temporary deactivation regime, called hibernation. In this study, it was found that during the hibernation of a pull in/out winch, used for connection/disconnection of offshore oil lines, there were failures in the management of integrity risks, which led to loss of profit, environmental impact and injury. Thus, the objective was to structure, in the light of the Bow Tie methodology, barriers to degradation in order to improve integrity for future operations. To this end, a qualitative approach was adopted based on literature review, field and documentary survey, in addition to the techniques of APR (Preliminary Risk Analysis), Risk Matrix and AAF (Failure Analysis Tree) to help the collection and analysis of data for the construction of the Bow Tie diagram. The Soft DSR (Soft Design Science Research) method proved to be adequate for the stages of this methodological approach. The result was a more robust degradation risk management, based on the solution consolidated in a Bow Tie diagram and an action plan, structured in 15 preventive barriers and 14 mitigation/recovery barriers, with reflections on safety and equipment readiness.

Downloads

Download data is not yet available.

References

Andrade, RRD (2022) ‘Using Bow Tie as a tool for assessing the operational continuity of mature assets’, Brazilian Journal of Development. v.8, n. 6, p. 42494-42516.

Associação Brasileira de Normas Técnicas (2018) ‘NBR ISO 31000 - Gestão de Riscos’.

Associação Brasileira de Normas Técnicas (2014) ‘NBR ISO 55000 - Gestão de Ativos’.

Barros, CF, Rodrigues, V, Colombo, D, Cardoso, R e Tammela, I (2019). Análise de riscos para reduzir a ocorrência de blowouts na perfuração de poços de petróleo: Integrando o CBM ao método Bow Tie. ABRISCO.

Behari, N (2018) ‘Growing role of human-machine interaction in risk management: A risk management evaluation for safety-critical equipment (SCE), including use of a risk matrix, is fundamental to controlling operating hazards, but even proven industry hazard determination templates won't work with outdated data’ Control Engineering, v 65, n. 11, p. 1.

Baskerville, R, Pires-Heje, J and Venable, J (2009) ‘Soft Design Science Methodology, 4th International Conf. on Design Science Research in information Systems and Technology, n. 9, p. 1-11.

Dias, DDS, Silva, MF (2009) ‘Como Escrever Uma Monografia’, Coppead-UFRJ, v. 384, s n., p.1-74.

Fogliatto, FS and Ribeiro, JLD (2009) Confiabilidade e manutenção industrial: Elsevier.

Grattan, DJ (2018) ‘Improving barrier effectiveness using human factors method’, Journal of Loss Prevention in the Process Industries, v 55, p. 400-410.

Hansler, RJ, Bellamy, LJ and Akkermans, HA (2022) ‘Ageing assets at major hazard chemical sites – The Dutch Experience’, Safety Science, v 153. 105788.

Leoni, L, Carlo, F, Paltrinieri, N, Sgarbossa, F and Toroody, AB (2021) ‘On risk-based maintenance: A comprehensive review of three approaches to track the impact of consequence modelling for predicting maintenance actions’, Journal of Loss Prevention in the Process Industries. v 72, 104555.

Mantom, M, Johnson, M, Pitblado, R, Cowley, C and Krishna, K (2017) ‘Standardisation of Bow Tie Methodology and Terminology via a CCPS/EI Book’, Hazards, v 27, n 162.

Vaughen, BK (2020) ‘Understanding and managing the risk during transient operations’, Process Safety, v. 39, e12146.

Volkman, G and Dunn, SC (2013) ‘Guidance on the Stand Down, Mothball, and Reactivation of Ground Test Facilities’, American Institute of Aeronautics and Astronautics.

Zheng, EZH e Carvalho, MM (2016) ‘Armadilhas no gerenciamento de riscos de cima para baixo: uma pesquisa ação em uma empresa de engenharia’, Produção Online, v. 16, p. 822-843.

Published

12/26/2024

Issue

Section

Engenharias

How to Cite

Gomes da Silva, J. and de Oliveira Barros, C.F. (2024) “Engenharia de hibernação e o método Bow Tie: melhoria na gestão de riscos para maior integridade de um sistema de pull in/out”, Latin American Journal of Energy Research, 11(2), pp. 53–63. doi:10.21712/lajer.2024.v11.n2.p53-63.

Similar Articles

21-30 of 107

You may also start an advanced similarity search for this article.